A distinctive, creatively designed office in Munich

London-based architect Stefanie Sebald is part of our team. Together with her and our experts in modern working practices and spatial design, we created this office space. It combines a warm, creative atmosphere with professional working conditions, including Hundertwasser-style mosaics and other distinctive details. The building is in Parkstadt Bogenhausen in eastern Munich. It was comprehensively refurbished and fitted out through 2021.

Facts

  • 566 m² of office space, divisible from 104 m²
  • 3–5 underground parking spaces
  • First floor
  • Rent of €25.00/m², commission-free
  • Advance service charges of €3.50/m²
  • Additional 9 m² basement storage at €9.50/m²
  • Available immediately or by arrangement

Video

Double-click to view full screen.

Features

  • Professional working conditions combined with distinctive creative elements, including Hundertwasser-style mosaics
  • Rooms of different sizes and designs for different tasks, from individual offices to lecture and training rooms with a high-quality partition
  • First occupancy following refurbishment
  • Modern facade with floor-to-ceiling windows and abundant daylight
  • All shown light fittings included, with matching new furniture available to purchase on request
  • Ceiling heights from 2.85 m to 3.25 m
  • High-quality carpet and ash-effect Amtico flooring
  • Fiber connection, Wi-Fi preparation, server room, and CAT7 cabling beneath raised floors
  • Cooling ceilings and external sun protection
  • Spacious kitchen with ceramic hob, oven, dishwasher, extractor hood, and refrigerator
  • Passenger elevator
  • Accessible basement toilet and accessible office areas
  • Basement shower
  • 3–5 underground parking spaces

 

Location

Energy performance certificate

  • Certificate available
  • Main energy sources for heating and hot water: natural gas E, electricity mix, and fossil-fuel combined heat and power
  • Final energy demand for heating: 44.6 kWh/(m²·year), electricity: 27.0 kWh/(m²·year)
  • Issued August 16, 2021, valid until August 15, 2031

Ask the expert

Clara Radunsky
Project Leader
clara-blog

IMG_1431 Kopie Vari
Clip path group